Mark Henley Photography

  • Multimedia
  • About
  • Instagram
  • Tearsheets
  • Contact
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
Show Navigation

Image 1 of 1

Passes1198.jpg

Add to Lightbox Download
Tunnel close to the summit of the Susten Pass (2224m), connecting Uri and Bern, shortly before it closed for a seven month winter. Despite attempts in previous centuries, the road was only completed in 1946, for use officially for both tourism and the millitary. The area around the St Gottard massive, was part of the National Redoubt, the final Swiss line of defence in the high alps, and is checkered with the remains of millitary installations, many of them underground, still camouflaged. This is the last day that the authorities cleared the road. It closed with the next snow fall two days later.
Copyright
© Mark Henley/Panos Pictures
Image Size
4288x2848 / 5.3MB
Contained in galleries
Closing Time
Tunnel close to the summit of the Susten Pass (2224m), connecting Uri and Bern, shortly before it closed for a seven month winter. Despite attempts in previous centuries, the road was only completed in 1946, for use officially for both tourism and the millitary. The area around the St Gottard massive, was part of the National Redoubt, the final Swiss line of defence in the high alps, and is checkered with the remains of millitary installations, many of them underground, still camouflaged.  This is the last day that the authorities cleared the road. It closed with the next snow fall two days later.